De-fishing ahead of major works within existing waterway
Installation of a 1800mm diameter culvert, wingwalls and associated stream bed alignment and armouring.
Key project takeaways –
“Fish migration limited the timing of install to the winter months, giving rise to additional challenges with water table and remediating unsuitable subgrade. Our crew worked long days while the pump was in operation to get the job done.”
John Monu, Project Manager