Two months up on the farm track
Works included set out and construction of roading and utility services along an existing farm track. As a working farm, we installed 4 new cattle stops.
Key project takeaways –
“There were days we were labouring in trenches up in the drizzle and mist and we couldn’t see further than 5 metres ahead of us. But then there were the most glorious fine days with visibility over the Cook Strait to the South Island. These days make up for the muddy working conditions and, working as a team, we push on through it where we can. There are, however, days when it just isn’t worth the mess”
John Pritchard, Managing Director