Project details

Significant lawn investment by client to resolve issues of a high water table

The scope of this project was to remediate a soft lawn that was not able to be mowed in the winter months.  Works involved the placement of a drainage blanket comprising pebbles wrapped in geotextile, overlaid with topsoil and re-sown.  Alongside the ponds, our crew installed timber edging together with a burrito wrapped french drain.  An old grass tennis court faced the same water logging issues; this was remediated by undercutting and replacing the soft material with AP65, laying megaflo subsoils and placing a reinforced concrete slab.

Key Project takeaways –

“We are proud of our crew who worked diligently to create a quality product for the client that is now able to be maintained all year round and can be enjoyed by their family for many years to come.”

Mel Fulford, Contracts Manager